首页 | 本学科首页   官方微博 | 高级检索  
     

三峡左岸高程98.7m混凝土拌和系统预冷混凝土设计
引用本文:锡建中.三峡左岸高程98.7m混凝土拌和系统预冷混凝土设计[J].四川水力发电,1998,17(2):41-44.
作者姓名:锡建中
作者单位:三峡工程左岸高程98.7m混凝土拌和项目部!湖北宜昌,443133
摘    要:三峡工程左岸98.7m混凝土拌和系统工程,预冷混凝土设计采用的工艺流程目前在国际上也是先进的,本文综合的介绍了设计参数、工艺流程、主要技术经济指标,供同行在进行设计和施工中参考。

关 键 词:三峡工程  预冷混凝土设计  工艺流程  技术经济指标

Precooled Concrete Design in Concrete Mixing Plant at Elevation 98. 7m on the Left Bank of the Three Gorges
Yi Jianzhong.Precooled Concrete Design in Concrete Mixing Plant at Elevation 98. 7m on the Left Bank of the Three Gorges[J].Sichuan Water Power,1998,17(2):41-44.
Authors:Yi Jianzhong
Abstract:Technological process used in precooled concrete in concrete mixing plant at elevation 98. 7m on the left bank of the Three Gorges is advanced in the world. The design parpmeters,technological process,main technical and economic indexes are provided for the reference to engineers in design and construction.
Keywords:the Three Gorges project  precooled concrete design  technological process  main technical and economical indexes  