首页 | 本学科首页   官方微博 | 高级检索  
     

瀑布沟水电站调速器齿盘测频改造
引用本文:刘利.瀑布沟水电站调速器齿盘测频改造[J].广西水利水电,2014(3):47-49.
作者姓名:刘利
作者单位:国电大渡河瀑布沟水力发电总厂,四川汉源625304
摘    要:介绍了瀑布沟水电站调速器残压测频与齿盘测频两种机组频率测量方法的特点。分析了原齿盘测频回路存在的测值不准、波动大等问题的原因,论述了齿盘测频硬件回路的改造方法和改造后的测量效果。

关 键 词:调速器  齿盘测频  残压测频  瀑布沟水电站

Upgrade of governor toothed disk frequency measuring system at Pubugou Hydropower Station
LIU Li.Upgrade of governor toothed disk frequency measuring system at Pubugou Hydropower Station[J].Gx Water Resources & Hydropower Engineering,2014(3):47-49.
Authors:LIU Li
Affiliation:LIU Li (Pubugou Hydropower General Plant of China GUODIAN DADU River, Hanyuan County 625304, Sichuan Province, China)
Abstract:An introduction was made on the characteristics of two kinds of unit frequency measuring methods, i.e. toothed disk and residual voltage frequency measuring which are adopted for the governor of Pubugou Hydropower Station. The original toothed disk frequency measuring circuit rendered inaccurate value with considerable fluctuation. The author presented the upgrade method of toothed disk frequency measuring hardware circuit as well as the effects.
Keywords:Governor  toothed disk frequency measuring  residual voltage frequency measuring  Pubugou Hydro-power Station
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号