首页 | 本学科首页   官方微博 | 高级检索  
     


Scheduling of a multi-robot assembly cell
Affiliation:1. Chair of Process Control Engineering, RWTH Aachen University, Aachen, Germany;2. ABB Corporate Research, Ladenburg, Germany;1. Technische Universität Darmstadt, Fachgebiet Management Science / Operations Research, Hochschulstraße 1, Darmstadt 64289, Germany;2. CIRRELT and Département de Mathématiques et de Génie Industriel, École Polytechnique de Montréal, Montreal H3C 3A7, Canada
Abstract:One of the key problems in robotics is to make full use of the flexibility provided by the robots. This flexibility can be used to assemble variants of the same product or even different products in the same cell. In a multi-robot assembly cell, flexibility may also mean that some operations can be performed by different robots. This choice of robots leads to a new problem: how to distribute the assembly operations among the robots to minimize global assembly time. The paper presents different approaches to this problem: the synchronous approach, which enables on-line scheduling, and the asynchronous approach, which requires offline scheduling, but enables better assembly times. These different approaches have been tested on real assembly cases (e.g. an electrical signalling relay) and simulated on a robotics CAD system (ROBCAD). Results are presented and discussed.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号