宝钢三高炉冷却壁更换施工技术
引用本文:王雄,朱宝良,彭根东.宝钢三高炉冷却壁更换施工技术[J].宝钢技术,2005(2):1-3.
作者姓名:王雄  朱宝良  彭根东
作者单位:上海宝治建设工安分公司,上海,201900;上海宝治建设工安分公司,上海,201900;上海宝治建设工安分公司,上海,201900
摘    要:介绍宝钢三高炉S3段冷却壁更换施工技术.该技术实现了高炉宝修期间且作业人员不进入炉内就能完成大面积冷却壁拆除与安装的短期化、安全施工的目标,达到了国际先进水平.可为类似工程的施工提供参考.

关 键 词:高炉  冷却壁  更换
文章编号:1008-0716(2005)02-0001-03

Construction technology of replacing cooling stave of Baosteel No.3 BF
Wang Xiong,Zhu Bao-liang,Peng Gen-dong.Construction technology of replacing cooling stave of Baosteel No.3 BF[J].Baosteel Technology,2005(2):1-3.
Authors:Wang Xiong  Zhu Bao-liang  Peng Gen-dong
Abstract:Construction technology of replacing the cooling stave (S3 section) of Baosteel' s blast furnace No. 3 is introduced. This technology has helped achieve the goal of dismantling and replacing large-area cooling stave safely in a short time with no workers entering the furnace during period of the BF overhaul . As it has reached the world advanced level, this technology can be used as reference for similar projects .
Keywords:blast furnace  cooling stave  replace