矩形顶管机施工中遇到的障碍及清障技术
引用本文:舒钢强.矩形顶管机施工中遇到的障碍及清障技术[J].中国市政工程,2010(4):66-68.
作者姓名:舒钢强
作者单位:上海隧道工程股份有限公司,上海,200082
摘    要:矩形顶管主要用于城市繁华街区施工地下通道,覆土深度一般为4~6m。描述了矩形顶管机在某市施工地下通道中遭遇大直径、高强度石块以及中间井设计、基坑围护、开挖、清障、修复顶管机机头等情况。总结的一些施工经验可供同行借鉴。

关 键 词:矩形顶管机  施工  地下通道  清障

On the Obstacle and Obstacle Clearing Technique during the Operation of Rectangular Pipe-jacking Machine
SHU Gang-qiang.On the Obstacle and Obstacle Clearing Technique during the Operation of Rectangular Pipe-jacking Machine[J].China Municipal Engineering,2010(4):66-68.
Authors:SHU Gang-qiang
Abstract:Rectangular pipe-jacking machine is applied mainly in the underground tunnels of urban busy streets with the buried depth of 4-6 m. Taking a project for example, several construction conditions are put forward including meeting with large diameter & high strength rock, the intermediate well design, foundation pit bracing, excavation, obstacle clearing and the top of pipe-jacking machine mending. The construction experience can provide reference for the colleague.
Keywords:rectangular pipe-jacking machine  construction  underground tunnel  obstacle clearing