引子渡水电站滑模施工工艺简介
引用本文:武斌忠. 引子渡水电站滑模施工工艺简介[J]. 大坝与安全, 2004, 0(2): 47-49
作者姓名:武斌忠
作者单位:引子渡水电站411水电联营体,贵州,平坝,561105
摘    要:引子渡水电站引水发电系统由引水隧洞、调压井、发电厂房及开关站等组成,经工期、成本、质量、安全综合分析比较,联营体在引水隧洞调压井和厂房尾水闸墩部位采用了液压滑模施工技术。取得了较好的工程效益和经济效益。

关 键 词:引子渡水电站  滑模  调压井  施工工艺
文章编号:1671-1092(2004)02-0047-03
修稿时间:2004-03-03

Introduction on construction technique of slipform in Yinzidu hydropower station
by WU Bin-zhongHydropower Project Joint-operation of Yinzidu Hydropower Station. Introduction on construction technique of slipform in Yinzidu hydropower station[J]. Large Dam & Safety, 2004, 0(2): 47-49
Authors:by WU Bin-zhongHydropower Project Joint-operation of Yinzidu Hydropower Station
Affiliation:by WU Bin-zhong411Hydropower Project Joint-operation of Yinzidu Hydropower Station
Abstract:The power conduit system of Yinzidu project consists of water tunnel,surge shaft,powerhouse and switch station etc.construction technology of hydraulic slipform was adopted in constructing the parts of surge shaft of water tunnel and tail pier of powerhouse.It gained better proj5ect profit and remarkable economic benefit.
Keywords:Yinzidu hydropower station  slipform  construction technique