首页 | 本学科首页   官方微博 | 高级检索  
     

西北水利水电工程施工
引用本文:曾宪典. 西北水利水电工程施工[J]. 西北水电, 2000, 0(3): 41-46
作者姓名:曾宪典
作者单位:国家电力公司西北勘测设计研究院,西安
摘    要:西北水利水电工程施工,经过50年的艰苦奋斗,已建成各种类型水利水电工程30余座,并完成大量前期设计项目。文中总结了已建工程施工技术和优化施工组织设计的实践经验,为今后水利水电工程施工提供借鉴。

关 键 词:水利水电 施工技术 优化设计 实践经验

Construction techniques for water and hydropwer projects in Northwest China
Zing Xiandian. Construction techniques for water and hydropwer projects in Northwest China[J]. Northwest Water Power, 2000, 0(3): 41-46
Authors:Zing Xiandian
Abstract:Through 50 years arduous efforts, more than 30 water and hydropower projects of various type have been constructed andearly stage design of many other projects have been completed in Northwest China. The paper summarizes the construction techniques of theexisting projects and the practical experiences in optimal construction organization design which can be used in construction of futurehydropower projects.
Keywords:water and hydropower project   construction technique   optimal design   practical experience
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号