首页 | 本学科首页   官方微博 | 高级检索  
     

典型顺层高边坡工程病害的地质力学模型试验研究
引用本文:孙书伟,朱本珍,马惠民.典型顺层高边坡工程病害的地质力学模型试验研究[J].岩土工程学报,2008,30(9):1349-1355.
作者姓名:孙书伟  朱本珍  马惠民
作者单位:铁道科学研究院;中铁西北科学研究院;
基金项目:科技部科研院所技术开发研究专项基金
摘    要:以万梁高速公路某顺层高边坡病害治理工程为背景,采用地质力学模型试验方法,完成了顺层高边坡有无支挡模型的对比试验。给出了顺层高边坡工程病害的相似物理模拟方法,采用均匀毛细浸润技术模拟雨水对模型滑带材料的影响,得到了开挖、降雨以及支挡工况下顺层高边坡工程病害的发展形态以及抗滑支挡结构的受力特点。结果表明,在无支挡条件下坡体具有牵引式加速下滑的运动特点,且坡面质点的运动速率比滑带质点大,抗滑支挡结构的施加不仅限制了坡体位移,而且使坡体呈现出了推动式的运动特点;工后降雨会引起锚索预应力的较大损失,对锚索抗滑桩中锚索而言,约为设计值的10%;对于框架锚索而言,多次降雨会直接影响到结构的长期可靠性。

关 键 词:岩土工程  顺层高边坡  病害  地质力学模型试验  均匀毛细浸润技术  预应力损失  

Geomechanical model tests on slope hazards of typical high bedding rock slopes
SUN Shuwei,ZHU Benzhen,MA Huimin.Geomechanical model tests on slope hazards of typical high bedding rock slopes[J].Chinese Journal of Geotechnical Engineering,2008,30(9):1349-1355.
Authors:SUN Shuwei  ZHU Benzhen  MA Huimin
Affiliation:1.China Academy of Railway Sciences Beijing 100081 China 2.Northwest Research Institute Co. Ltd.of CREC Lanzhou 730000 China
Abstract:Based on the reinforcement engineering of the high bedding rock slope of Wanzhou Liangping Expressway,two models,among which one was reinforced and the other was not reinforced,were compared by geomechanical model tests.A method to simulate slope hazards of high bedding rock slope was given.During the tests,the influence of rain on slopes was simulated by the uniform capillary flooding method.The variation of displacement of slopes under excavation,rainfall and reinforcement and the variation of stress in anti-slide structures were presented.It was shown that,without anti-slide structure,the sliding mass moved in an accelerating pull type and the mass points on surface moved with a larger speed than that of the points in sliding body,but the effect of anti-slide structure could not only limit the displacement of sliding mass but also make the sliding mass moving in a push type.Rain fall caused a great loss of prestress of anchor wires.As for the anchor wires in anchor cable-pile,the percentage of loss was about 10%;repeated rain fall might have a disastrous effect on the long-term reliability of the structure with regard to the anchor wires in anchor frames.
Keywords:geotechnical engineering  high bedding rock slope  hazard  geomechanical model test  uniform capillary flooding method  loss of prestress
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《岩土工程学报》浏览原始摘要信息
点击此处可从《岩土工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号