首页 | 本学科首页   官方微博 | 高级检索  
     

Preliminary Beam Line Design for CYCIAE-100 Project
引用本文:WEI Su-min LU Yin-long ZHANG Tian-jue ZHOU Zheng-he LI Zhen-guo CHU Cheng-jie WU Long-cheng JIA Xian-lu GUAN Feng-ping PAN Gao-feng YIN Zhi-guo HOU Shi-gang GE Tao. Preliminary Beam Line Design for CYCIAE-100 Project[J]. 中国原子能科学研究院年报, 2005, 0(1): 33-35
作者姓名:WEI Su-min LU Yin-long ZHANG Tian-jue ZHOU Zheng-he LI Zhen-guo CHU Cheng-jie WU Long-cheng JIA Xian-lu GUAN Feng-ping PAN Gao-feng YIN Zhi-guo HOU Shi-gang GE Tao
摘    要:The Beijing Radioactive Ion-beam Facility (BRIF) is one of the main projects at China Institute of Atomic Energy (CIAE), and will be a versatile platform for nuclear study in China. As a major part of this project, the 100 MeV cyclotron is designed to provide protons beam from 75 MeV to 100 MeV continuously. When the construction is accomplished, the beam dump system will be used to debug the machine. Then the adjusted beam is transported to the target through the ISOL proton line, isotope study proton line, single energy neutron source proton line, mix energy neutron source proton line, biomedicine study proton line, single particle effect study proton line, and etc.

关 键 词:回旋加速器 CYCIAE-100 质子束流管道 光学匹配 设计

Preliminary Beam Line Design for CYCIAE-100 Project
Abstract:
Keywords:
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号