高水头压水试验在引黄工程泵站中的应用
引用本文:曹催晨.高水头压水试验在引黄工程泵站中的应用[J].山西水利科技,1998(Z1).
作者姓名:曹催晨
作者单位:山西省万家寨引黄工程总公司
摘    要:引黄工程总干一、二级泵站和南干一、二级泵站设计扬程均为140m,若考虑特殊工况下的水锤作用,内水压力最大可达213m,为了查明隧洞围岩在高内水压力下的稳定和抗力强度问题,并为优化隧洞衬砌形式提供有关地质参数,在上述四个泵站的勘探钻孔中,分别进行了高水头压水试验,取得了较满意的成果

关 键 词:引黄工程,泵站,高水头压水试验

Application of High head Pressure Test in the Pumping Station of the YRDP
Cao Cuicheng.Application of High head Pressure Test in the Pumping Station of the YRDP[J].Shanxi Hydrotechnics,1998(Z1).
Authors:Cao Cuicheng
Affiliation:Shanxi Wanjiazhai Yellow River Diversion Project Corporation
Abstract:The design lift head of the primary and second stage pumping stations in both the General Main Line and the South Main Line is 140m,the internal water pressure may be up to 213m if the water hammer pressure under special working condition is considered.In order to clarify the stability of seepage prevention and destructiveness of surrounding rock of tunnel under high internal water pressure,the high head water pressure test is done respectively in the exploratory holes of the above four pumping stations.The test result shows that the pressure tunnel may be lined with reinforced concrete,but grouting measures should be surely taken in weak section of the surrounding rock.The writer takes it that the high head water pressure test may be regarded as a supplement and improvement of other methods such as core drilling,ground stress test and supersonic wave test according to the strong and weak points of each test.
Keywords:Pumping Station\ High  head Water Pressure Test