含荷电状态修正和通信延迟的储能电站负荷频率鲁棒控制
引用本文:吕永青,窦晓波,杨冬梅,何国鑫.含荷电状态修正和通信延迟的储能电站负荷频率鲁棒控制[J].电力系统自动化,2021,45(10):59-67.
作者姓名:吕永青  窦晓波  杨冬梅  何国鑫
作者单位:东南大学电气工程学院,江苏省南京市 210096;南瑞集团有限公司(国网电力科学研究院有限公司),江苏省南京市 211106
基金项目:本文受到智能电网保护和运行控制国家重点实验室资助项目(面向电网辅助服务的大容量储能运行控制技术)支持,特此感谢!
摘    要:针对储能电站参与调频时与传统机组的协调问题及通信延迟产生的影响,设计了一种含荷电状态(SOC)修正和通信延迟的储能电站负荷频率鲁棒控制方法.首先,在储能电站参与频率控制过程设计SOC回归修正环节与传统机组进行协调而实现SOC裕度调节,同时考虑协调过程存在通信延迟问题,建立含储能电站SOC回归修正的区域电网延迟系统模型.其次,考虑通信延迟对于系统控制性能的影响,在负荷频率控制系统延迟边际计算的基础上,设计储能电站负荷频率控制的系统鲁棒控制器,对可再生能源功率扰动进行抑制并实现系统频率的快速恢复与偏差调节.最后,基于MATLAB/Simulink平台对负荷频率控制系统进行仿真验证,结果证明了所提方法的有效性.

关 键 词:调频  储能电站  荷电状态  通信延迟  鲁棒控制
收稿时间:2020/8/11 0:00:00
修稿时间:2021/1/3 0:00:00

Load-frequency Robust Control for Energy Storage Power Station Considering Correction of State of Charge and Communication Delay
LYU Yongqing,DOU Xiaobo,YANG Dongmei,HE Guoxin.Load-frequency Robust Control for Energy Storage Power Station Considering Correction of State of Charge and Communication Delay[J].Automation of Electric Power Systems,2021,45(10):59-67.
Authors:LYU Yongqing  DOU Xiaobo  YANG Dongmei  HE Guoxin
Affiliation:1.School of Electrical Engineering, Southeast University, Nanjing 210096, China;2.NARI Group Corporation (State Grid Electric Power Research Institute), Nanjing 211106, China
Abstract:To solve the coordination problems between energy storage power stations when participating in frequency regulation and traditional units and the influence of communication delay, this paper designs a load frequency robust control method for energy storage power station considering the correction of state of charge and communication delay. Firstly, the regression and amendment link of state of charge (SOC) is designed to coordinate with traditional units when the energy storage power station participates in the frequency control to realize the SOC margin adjustment. Then, considering the effect of communication delay, this paper designs a delay system model of regional power grids with regression and correction of SOC in energy storage power stations. Secondly, considering the impact of communication delay on design performance of system control, the system robust controller is designed for load frequency control of energy storage power stations based on the delayed marginal calculation of the load frequency control system to restrain power disturbance of renewable energy sources and realize the quick recovery of system frequency. Finally, the simulation of the load frequency control system is implemented in the MATLAB/Simulink platform, and the validity of the proposed strategy is verified.
Keywords:frequency regulation  energy storage power station  state of charge (SOC)  communication delay  robust control