首页 | 本学科首页   官方微博 | 高级检索  
     

Simultaneous Nitrogen and Phosphorus Removal by Denitrifying Dephosphatation in a(AO)2 Sequencing Batch Reactor
引用本文:张艳萍,彭永臻,王淑莹,王少坡. Simultaneous Nitrogen and Phosphorus Removal by Denitrifying Dephosphatation in a(AO)2 Sequencing Batch Reactor[J]. 北京理工大学学报(英文版), 2005, 14(1): 104-108
作者姓名:张艳萍  彭永臻  王淑莹  王少坡
作者单位:KeyLaboratoryofBeijingforWaterQualityScienceandWaterEnvironmentRecoveryEngineering,BeijingUniversityofTechnology,Beijing100022,China
基金项目:国家自然科学基金,the Project for Key Laboratory of Beijing
摘    要:A 24 L working volume reactor was used for the research on simultaneous phosphorus (P) and nitrogen (N) removal by denitrifying dephosphatation in an anaerobic-oxid-anoxic-oxid sequencing batch reactor((AO)2SBR) system. The durations of each phase are: anaerobic 1.5 h, aerobic 2.5 h, anoxic 1.5 h, postaerobic 0.5 h, settling 1.0 h, fill 0.5 h. The successful removal of nitrogen and phosphorus is achieved in a stable (AO)2SBR. The effluent P concentrations is below 1 mg/L, and the COD, TN and P average removal efficiency is 88.9 %, 77.5 % and 88.7 %, respectively. The batch experiment results show that the durations of aerobic and anoxic phase influence the P removal efficiency. Some feature points are found on the DO, ORP and pH curves to demonstrate the complete of phosphate release and phosphate uptake. These feature points can be used for the control of (AO)2 SBR.

关 键 词:废水处理 反应堆 磷 氮
收稿时间:2004-10-26

Simultaneous Nitrogen and Phosphorus Removal by Denitrifying Dephosphatation in a (AO)2 Sequencing Batch Reactor
ZHANG Yan-ping,PENG Yong-zhen,WANG Shu-ying and WANG Shao-po. Simultaneous Nitrogen and Phosphorus Removal by Denitrifying Dephosphatation in a (AO)2 Sequencing Batch Reactor[J]. Journal of Beijing Institute of Technology, 2005, 14(1): 104-108
Authors:ZHANG Yan-ping  PENG Yong-zhen  WANG Shu-ying  WANG Shao-po
Affiliation:Key Laboratory of Beijing for Water Quality Science and Water Environment Recovery Engineering, Beijing University of Technology, Beijing 100022, China
Abstract:A 24 L working volume reactor was used for the research on simultaneous phosphorus (P) and nitrogen (N) removal by denitrifying dephosphatation in an anaerobic-oxid-anoxic-oxid sequencing batch reactor ((AO)2SBR) system. The durations of each phase are: anaerobic 1.5 h, aerobic 2.5 h, anoxic 1.5 h, post-aerobic 0.5 h, settling 1.0 h, fill 0.5 h. The successful removal of nitrogen and phosphorus is achieved in a stable (AO)2SBR. The effluent P concentrations is below 1 mg/L, and the COD,TN and P average removal efficiency is 88.9%, 77.5% and 88.7%, respectively. The batch experiment results show that the durations of aerobic and anoxic phase influence the P removal efficiency. Some feature points are found on the DO, ORP and pH curves to demonstrate the complete of phosphate release and phosphate uptake. These feature points can be used for the control of (AO)2 SBR.
Keywords:domestic wastewater  sequencing batch reactor  denitrifying dephosphatation  nitrogen removal
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《北京理工大学学报(英文版)》浏览原始摘要信息
点击此处可从《北京理工大学学报(英文版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号