首页 | 本学科首页   官方微博 | 高级检索  
     

预制直埋热水供热管道河底穿越施工方案
引用本文:赵仲君,王佳.预制直埋热水供热管道河底穿越施工方案[J].煤气与热力,2010,30(9):13-15.
作者姓名:赵仲君  王佳
作者单位:[1]唐山市热力总公司,河北唐山063000 [2]中国市政工程华北设计研究总院,天津300074
摘    要:结合工程实例,对预制直埋热水供热管道河底穿越的施工过程进行了探讨,分析了安全生产的保证措施。

关 键 词:预制直埋热水供热管道  河底穿越  施工  安全生产

Construction Plan of Prefabricated Directly Buried Hot-water Heating Pipeline across River Bottom
ZHAO Zhong-jun,WANG Jia.Construction Plan of Prefabricated Directly Buried Hot-water Heating Pipeline across River Bottom[J].Gas & Heat,2010,30(9):13-15.
Authors:ZHAO Zhong-jun  WANG Jia
Affiliation:ZHAO Zhong-jun, WANG Jia
Abstract:Combined with an engineering example, the construction process of prefabricated directly buried hot-water heating pipeline across river bottom is discussed, and the measures for ensuring the safety production are analyzed.
Keywords:prefabricated directly buried hot-water heating pipeline  fiver bottom crossing  construction  safety production
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号