首页 | 本学科首页   官方微博 | 高级检索  
     

基于BIM的预制构件采购过程研究
引用本文:杨坤,张洋. 基于BIM的预制构件采购过程研究[J]. 山西建筑, 2010, 36(27): 367-368
作者姓名:杨坤  张洋
作者单位:1. 山东省城乡建设勘察院,山东济南,250031
2. 国家开发银行青岛市分行,山东青岛,266000
摘    要:简单介绍了建筑构件生产的基本流程,对传统的ETO构件采购过程存在的问题进行了分析,具体阐述了基于BIM的构件预制过程,指出基于BIM的构件采购过程能更好地保证施工图与装配图的一致性,并保证构件的供货时间。

关 键 词:预制构件  BIM  供货时间

The purchasing process research on the based BIM prefab component
YANG Kun,ZHANG Yang. The purchasing process research on the based BIM prefab component[J]. Shanxi Architecture, 2010, 36(27): 367-368
Authors:YANG Kun  ZHANG Yang
Affiliation:YANG Kun ZHANG Yang
Abstract:This paper has a brief introduction on the basic process of the producing construction component.It has an analysis on the existed problems of traditional ETO component purchasing process and has a detailed exposition on the prefabrication process.Pointing out the purchasing process on based BIM can guarantee the consistency of construction drawing and assembly drawing. To guarantee the shipment time of component.
Keywords:BIM
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号