首页 | 本学科首页   官方微博 | 高级检索  
     


Establishment and Analysis of the Fault Tree for the Oil Transfer Pump System in CNPC Work Zone
Authors:HUANG Hui  ;WANG Qiusheng  ;GAO Jie  ;YANG Jiaqi  ;XU Xiaodong
Affiliation:[1]School of Management, Northwestern Polytechnical University, Xi'an 710072, P. R. China; [2]Huaxin Consulting Co., Ltd, Hangzhou 310014, P. R. China
Abstract:The reliability of the equipment is very important for the large petrochemical industry,especially for oil pump as the core component of driving equipment. In order to reduce the loss of the enterprise brought by equipment failure,it is need to find those reasons which may lead to equipment failure and take some preventive measures as early as possible. This article analyzes the failure of the oil transfer pump system in CNPC work zone systematically,qualitatively and quantitatively,using the fault tree analysis method. Then 105 groups of minimal cut sets are found,and the probability of system failure after a certain time operation is calculated by using Weibull distribution. Combined with specific requirements of reliability,the work zone may make a scientific decision of plant maintenance cycle according to the conclusion.
Keywords:fault tree  reliability  Weibull distribution  plant maintain and management
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号