吊杆拱桥更换拉索工程的施工工艺
引用本文:程华才,梅传江,赵永宽.吊杆拱桥更换拉索工程的施工工艺[J].安徽建筑工业学院学报,2003,11(2):1-7.
作者姓名:程华才  梅传江  赵永宽
作者单位:安徽省交通科研所,蚌埠市公路直属分局,淮北市公路局 合肥 230011,蚌埠 233001,淮北 235001
摘    要:以合肥市寿春路桥吊杆更换为例,较全面地阐述了换索原因、施工前期准备、施工工艺及施工监测等情况,以期为国内其它此类型桥梁换索维修提供借鉴。

关 键 词:吊杆拱桥  换索  工艺  监测
修稿时间:2002年12月12日

CRAFT ON CHANGING THE CABLE ENGINEERING OF ARCHED BRIDGE PRE-STRESSED BOOM
CHENG Hua-cai,MEI Chuan-jiang,ZHAO Yong-kuan.CRAFT ON CHANGING THE CABLE ENGINEERING OF ARCHED BRIDGE PRE-STRESSED BOOM[J].Journal of Anhui Institute of Architecture(Natural Science),2003,11(2):1-7.
Authors:CHENG Hua-cai  MEI Chuan-jiang  ZHAO Yong-kuan
Abstract:Take the cable change of Shou Chun Road Bridge of Hefei City as an example, the reasons of the cable change, the early preparations of the coustruction, the construction technology and monitoring were thoroughly discussed as to be the experience for the same type of bridges at home.
Keywords:arched bridge pre-stressed boom  change cable  technology  control test