首页 | 本学科首页   官方微博 | 高级检索  
     

坚硬顶板深孔预裂爆破参数优化数值模拟研究
引用本文:王治文,陆银龙,吴秉臻,郭 鹏.坚硬顶板深孔预裂爆破参数优化数值模拟研究[J].中国矿业,2020,29(5).
作者姓名:王治文  陆银龙  吴秉臻  郭 鹏
作者单位:山西煤炭进出口集团左云韩家洼煤业有限公司,中国矿业大学 深部岩土力学与地下工程国家重点实验室,中国矿业大学 深部岩土力学与地下工程国家重点实验室,中国矿业大学 深部岩土力学与地下工程国家重点实验室
基金项目:国家自然科学基金项目(面上项目)(51874288)
摘    要:深孔预裂爆破是弱化坚硬顶板的一种有效方式,预裂爆破参数的选择对顶板弱化效果有很大影响。以山西某矿22205厚煤层坚硬顶板综放工作面的具体工程地质条件为背景,采用基于Hoek-Brown强度准则的岩体深孔预裂爆破影响区等效连续力学参数估算方法,运用FLAC3D软件建立了坚硬顶板深孔预裂爆破的三维数值计算模型,研究了不同的爆破孔距开切眼距离、爆破孔深度等关键参数对坚硬顶板初次来压的影响规律。在此基础上,合理设计优化了22205综放工作面坚硬顶板的深孔预裂爆破方案与参数,并进行了现场工程实践。现场矿压监测结果表明,采用深孔预裂爆破技术后,坚硬顶板的初次来压步距减小了约20m,显著改善了坚硬顶板来压期间的安全状况,保障了工作面的正常安全生产。

关 键 词:坚硬顶板  预裂爆破  参数优化  初次来压
收稿时间:2019/12/29 0:00:00
修稿时间:2020/5/11 0:00:00

Numerical simulation on parameters optimization of deep-hole pre-splitting blasting of hard roof
WANG Zhiwen,YinLong LU,WU Bingzhen and Guo Peng.Numerical simulation on parameters optimization of deep-hole pre-splitting blasting of hard roof[J].China Mining Magazine,2020,29(5).
Authors:WANG Zhiwen  YinLong LU  WU Bingzhen and Guo Peng
Affiliation:Shanxi Coal Import and Export Group Zuoyun Hanjiawa Coal Industry Co,Ltd,State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology,State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology,State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology
Abstract:Deep-hole pre-splitting blasting is an effective way to weaken the hard roof, but the selection of pre-splitting blasting parameters has a great influence on the roof weakening effect. A fully mechanized top coal caving face with hard roof in 22205 thick coal seam of a coal mine in Shanxi Province was selected the specific research background. An equivalent continuous mechanical parameters estimation method of rock mass after pre-splitting blasting was proposed based on Hoek-Brown strength criterion, and a three dimensional numerical model of deep-hole pre-splitting blasting of hard roof was established by using FLAC3D software. The effects of key parameters such as the distance between the blasting hole and the cutting hole and the depth of the blasting hole on the first roof weighting interval of the hard roof were studied. On this basis, the deep-hole pre-splitting blasting schemes and parameters of the hard roof of 22205 fully mechanized top-coal caving face were reasonably proposed and optimized, and the field engineering practice was carried out. The in-site mine pressure monitoring results showed that after adopting the deep-hole pre-splitting blasting technology, he first roof weighting interval of the hard roof was reduced by about 20m, which significantly improves the safety condition during the hard roof pressure and ensures the normal and safe production of the working face.
Keywords:hard roof  pre-splitting blasting  parameter optimization  first roof weighting pressure
本文献已被 CNKI 等数据库收录!
点击此处可从《中国矿业》浏览原始摘要信息
点击此处可从《中国矿业》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号