首页 | 本学科首页   官方微博 | 高级检索  
     

瓯江二桥主桥墩局部冲刷试验研究
引用本文:徐群,李浩麟. 瓯江二桥主桥墩局部冲刷试验研究[J]. 水利水运工程学报, 1998, 0(2)
作者姓名:徐群  李浩麟
作者单位:南京水利科学研究院河港研究所
摘    要:本文采用系列模型试验方法,对瓯江二桥主桥墩局部冲刷问题进行了研究。试验结果表明主桥墩最大冲刷深度与上游径流量及主桥墩轴线走向有关:对径流为百年一遇洪水流量,主桥墩轴线走向与水流流向一致时,其最大冲刷深度为11.69m;主桥墩纵轴线与流向夹角为20°时,最大冲刷深度为14.81m。试验得到施工围堰局部冲刷与流量的关系,得出最大冲刷深度,并提出围堰局部冲刷的防护措施。

关 键 词:系列模型试验  局部冲刷  最大冲刷深度

Model test study on local scour about main abutment of Oujiang''s second bridge
Xu Qun,Li Haolin. Model test study on local scour about main abutment of Oujiang''s second bridge[J]. Hydro-Science and Engineering, 1998, 0(2)
Authors:Xu Qun  Li Haolin
Affiliation:Nanjing Hydraulic Research Institute
Abstract:Making use of series model test, the local scour about the "lain abutment of Oujiang's second bridge were studied. The experiment results show that the maximum scour depth has relation to the runoff and the longitudinal axis trend of main abutment: the maximum scour depth is equal to 11. 69 m when the runoff is equal to 23 400m'/s (the runoff frequency is equal to 1 % ) and the longitudinal axis trend is parallel to the flow direction; it is 14.81 m when the included angle between the axis trend and the flow direction is 20 degree. The local scour and the erosion control measures about construction cofferdam of the main abutment are also studied.
Keywords:series model test   local scour   the maximum scour depth  
本文献已被 CNKI 等数据库收录!
点击此处可从《水利水运工程学报》浏览原始摘要信息
点击此处可从《水利水运工程学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号