首页 | 本学科首页   官方微博 | 高级检索  
     

卫95块HSG-1油藏流体流向控制技术
引用本文:赵长权,申立梅.卫95块HSG-1油藏流体流向控制技术[J].断块油气田,2010,17(1):119-120,128.
作者姓名:赵长权  申立梅
作者单位:中原油田分公司采油二厂,山东,莘县,252434
摘    要:油田进入特高含水开发期以来,随着采出程度的增加和油藏水淹程度的加剧,平面上剩余油分布更加零散,措施挖潜的余地小,难度大,产量递减快。卫95块多轮次调剖后,I类油层的增油潜力越来越小,Ⅱ、Ⅲ粪油层受调剖污染,注水井吸水厚度逐渐减少,层间矛盾加剧,调剖措施效果逐年变差。调剖后注水压力上升,甚至注不进水,但吸水剖面改善不理想,启动新层的效果变差。因此,在卫95块开展以HSC—1油藏流体流向控制技术为主导技术的区块深部液流转向,试验5个井组.工艺成功率100%,区块自然递减降低5.6个百分点,PI值提高了2MPa,井组累计增油量1430t,平均井组增油量286t,自然递减得到了有效控制,区块开发形势好转。该技术可以改善区块水驱开发效果,减缓递减,保持持续稳产,并为下一步在该区块及类似特高含水油藏区块开展此项工作提供新的思路和方法。

关 键 词:HSG-1体系  深部调堵技术  多轮次调剖  改善水驱

HSG-1 reservoir fluid flow control technology in Wei 95 Block
Zhao Changquan,Shen Limei.HSG-1 reservoir fluid flow control technology in Wei 95 Block[J].Fault-Block Oil & Gas Field,2010,17(1):119-120,128.
Authors:Zhao Changquan  Shen Limei
Affiliation:No.3 Oil Production Plant;Zhongyuan Oilfield Company;SINOPEC;Shenxian 252434;China
Abstract:Since the oilfield goes into the highest moisture period, with the increase of exploitation degree and sharp increase of oil reservoir flooding, residual oil distribution is more scattered horizontally. Room for measures of tapping potential is small and difficult. And yieht decreasing is fast. After several rounds of prufile adjustment in Wei 95 Block, potentiality of inereasing oil gets smaller and smaller in class I reservoir. Class Ⅱ and Ⅲ rcservoirs have been polluted by profile adjustment. The absorbent thickness of injection wells gradually decreases. Contradiction in layers is also aggravated. Effects of profile measures get worse year by year. Injecting pressure rises after profile adjustment, even water can not been injected. But suction profile is not ideal and the effect of starling new layers becomes worse. So in Wei 95 Block, block deep sleeting flow teehnology was developed, whieh takes HSG-I reservoir fluid flow control as guiding technology. We test 5 well groups, and suecess probability of technology is 100 pereent. Natural decline in this block cuts down 5.6 percent, and PI value has been up 2MPa. Accumulative increasing of oil production is to 1,430t, average increasing oil is to 286t per groups. Natural decline has been effectively controlled and exploitation situation gets better. The technology can improve water flooding development effect, slow down production decrease, keep stable yield and prnvide new ideas and methods for doing this kind of operations in this block and similar ultra-high water cut block.
Keywords:HSE-1 system  deep adjustable plugging  several rounds of profile adjustment  improving water flooding    
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号