OBAJANA#4总承包项目给排水系统分析 |
| |
引用本文: | 程洪亮,韩瑞邦.OBAJANA#4总承包项目给排水系统分析[J].水泥工程,2013(6):19-21. |
| |
作者姓名: | 程洪亮 韩瑞邦 |
| |
作者单位: | 中国中材国际工程股份有限公司(南京),江苏南京211100 |
| |
摘 要: | 全面介绍了尼日利亚OBAJANA 6 000 t/d熟料生产线总承包项目给排水系统的设计特点;重点对项目水源问题、水处理工艺选择、给排水系统划分等进行了方案分析;并对给排水各单体和各个系统的特点及系统的优缺点进行了逐一分析.
|
关 键 词: | 总承包 给排水系统 水处理 方案分析 |
Analysis of water supply and drainage system of OBAJANA #4 Line |
| |
Affiliation: | Cheng Hongliang, Han Bangrui(Sinoma Engineering Co.,Ltd.(Nanjing), 211100) |
| |
Abstract: | The design points of water supply and drainage system of Nigeria OBAJANA 6 000 t/d clinker production line general project were introduced comprehensively. And the schemes of water source, water treatment process, water supply and drainage system were mainly analysed, and the advantages and disadvantages of the drainage of each monomer and the characteristics of.each system was ana- lyzed one by one. |
| |
Keywords: | general project water supply and drainage system water treatment scheme analysis |