首页 | 本学科首页   官方微博 | 高级检索  
     

岂风大桥整体顶升技术
引用本文:郭继业,彭香红. 岂风大桥整体顶升技术[J]. 山西建筑, 2009, 35(15): 318-319
作者姓名:郭继业  彭香红
作者单位:1. 珠海市规划设计研究院市政二所,广东,珠海,519002
2. 中铁七局集团武汉工程有限公司,湖北,武汉,430071
摘    要:根据某桥梁工程基本概况及特点,介绍了PLC液压同步顶升控制系统、扁担梁和抱柱梁等技术在桥梁整体预升中的应用,实践证明通过这些技术的应用该桥顶升工作圆满完成,取得了良好的效益。

关 键 词:桥梁  PLC液压系统  同步顶升  扁担梁  抱柱梁

The integral lift-up technology of Qifeng Bridge
GUO Ji-ye,PENG Xiang-hong. The integral lift-up technology of Qifeng Bridge[J]. Shanxi Architecture, 2009, 35(15): 318-319
Authors:GUO Ji-ye  PENG Xiang-hong
Affiliation:GUO Ji-ye PENG Xiang-hong
Abstract:According to basic situation and characteristics of a bridge engineering,the PLC hydraulic synchronous lift-up control system,band and beam and embracing column beam application in bridge integral lift-up.The practice proved that the bridge lift-up was put across and obtained better economic efficiency with these technologies application.
Keywords:bridge  PLC hydraulic system  synchronous lift-up  band and beam  embracing column beam  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号