首页 | 本学科首页   官方微博 | 高级检索  
     

6201合金管材连续流变扩展挤压成形过程的数值模拟和实验研究
引用本文:管仁国,赵占勇,曹富荣,张秋生,黄红乾. 6201合金管材连续流变扩展挤压成形过程的数值模拟和实验研究[J]. 材料研究学报, 2011, 25(1): 25-31
作者姓名:管仁国  赵占勇  曹富荣  张秋生  黄红乾
作者单位:东北大学材料与冶金学院 沈阳 110004
基金项目:国家高技术研究发展计划项目2007AA03Z111、国家自然科学基金重点项目和面上项目(51034002, 50974038)和中央高校基本科研业务费N090502003资助。
摘    要:数值模拟和实验研究了6201合金管材连续流变扩展挤压成形过程中的温度场分布和熔体流动规律.结果表明,在连续流变扩展挤压6201合金管材过程中,辊-靴型腔中的合金等温线向轧辊侧偏移,随着浇注温度的升高半固态区间逐渐下移;在辊-靴型腔中合金熔体服从牛顿流体的层流运动规律,从工作辊表面向靴表面速度依次递减,在靴表面速度为0 ...

关 键 词:材料合成与加工工艺  流变成形  扩展  管材  半固态  温度
收稿时间:2010-09-29
修稿时间:2010-11-20

Simulation and Experimental Research on Continuous Extending Rheo-extrusion Process for Producing 6201 Alloy Tube
GUAN Renguo ZHAO Zhanyong CAO Furong ZHANG Qiusheng HUANG Hongqian. Simulation and Experimental Research on Continuous Extending Rheo-extrusion Process for Producing 6201 Alloy Tube[J]. Chinese Journal of Materials Research, 2011, 25(1): 25-31
Authors:GUAN Renguo ZHAO Zhanyong CAO Furong ZHANG Qiusheng HUANG Hongqian
Affiliation:School of Materials and Metallurgy, Northeastern University, Shenyang 110004
Abstract:Simulation and experimental investigation of temperature field distribution and metal flow behavior of 6201 alloy were conducted in this paper. The results show that during extending rheo– extrusion process, the isothermal lines of alloy deviate to the roll side in the roll–shoe gap, and semisolid region moves down little by little with the decrease of pouring temperature. Alloy melt in the roll–shoe gap flows by Newton laminar fluid law, and the velocity decreases gradually from the roll surface to the shoe surface where the velocity reaches 0 m·s−1. Alloy melt fills the extending cavity with a radial pattern layer by layer, and then it splits and concentrates. It also exhibits homogenous laminar flow. The flow velocity is maximal at the centers of the mould and the branch holes, and decreases gradually to the side wall. The flow lines on the cross section of the tube corresponding with the branch holes center and the wielding region are dense. But there is a transitional region where the flow line is sparse. The proper pouring temperature for producing 6201 alloy tube is between 750oC  and 780oC.
Keywords:synthesizing and processing technics     rheoforming  extending  tube  semisolid  temperature
本文献已被 CNKI 等数据库收录!
点击此处可从《材料研究学报》浏览原始摘要信息
点击此处可从《材料研究学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号