首页 | 本学科首页   官方微博 | 高级检索  
     


Constructability Concepts in Kuala Selangor Cable-Stayed Bridge in Malaysia
Authors:Mekdam A. Nima  Mohd R. Abdul-Kadir  Mohd S. Jaafar  Riadh G. Alghulami
Affiliation:1Senior Bridge Engineer, Earth Tech Canada Inc., Markham ON, Canada L3T 7W3; formerly, Head of Structural Dept., Khairi Consult Sdn. Bhd., Selangor, Malaysia.
2Deputy Dean of Engineering Faculty, Univ. Putra Malaysia, 43400?UPM?Serdang, Selangor, Malaysia.
3Head of Civil Engineering Dept., Dept. of Civil Engineering, Univ. Putra Malaysia, 43400?UPM?Serdang, Selangor, Malaysia.
4Senior Structural Engineer, Westbury Tubular Sdn. Bhd., Selangor, Malaysia.
Abstract:The writers formulated a case study of the Kuala Selangor Cable Stayed Bridge to examine the application of the constructability concepts particularly during the conceptual planning and the design phases of the project. This paper presents the advantages of implementing the constructability concepts and the barriers that were encountered when applying these concepts during the planning and design phases of the cable stayed bridge project of Kuala Selangor in Malaysia. The writers concluded that barriers to constructability implementation that are related to the owner were the major impediments in the application of constructability concepts during the early conceptual planning phase. The opinion of the engineer was another factor behind nonapplication of some other concepts. At the same time, many others were implemented due to the awareness and opinion of the engineer and his ability to control their application.
Keywords:Constructability  Project planning  Bridges, cable-stayed  Highway design  Construction methods  Malaysia  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号