冬瓜山铜矿初步设计概算编制的几点体会 |
| |
引用本文: | 侯建兴. 冬瓜山铜矿初步设计概算编制的几点体会[J]. 中国矿山工程, 2003, 32(3): 35-37 |
| |
作者姓名: | 侯建兴 |
| |
作者单位: | 中国有色工程设计研究总院,北京,100038 |
| |
摘 要: | 简述初步设计概算重要性,结合冬瓜山铜矿概算编制的实例,总结了编制初步设计概算的几点体会。
|
关 键 词: | 初步设计概算 工程量 概算指标 设备价格 |
文章编号: | 1002-8951(2003)03-0035-03 |
修稿时间: | 2003-04-26 |
Several points about budget estimate compilation of preliminary design for Dongguashan Copper Mine |
| |
Abstract: | This paper introduced the importance of preliminary design budget estimate. In combination with the estimate compilation for Dongguashan Copper Mine, several points about drawing up a budget of preliminary design are summarized. |
| |
Keywords: | budget estimate of preliminary design engineering quantity budget estimate indexes equipment price |
本文献已被 CNKI 万方数据 等数据库收录! |
|