首页 | 本学科首页   官方微博 | 高级检索  
     


Bicriteria scheduling of a material handling robot in an m-machine cell to minimize the energy consumption of the robot and the cycle time
Affiliation:1. Department of Engineering Science, University West, S-461 32 Trollhättan, Sweden;2. Department of Signals and Systems, Chalmers University of Technology, S-412 96 Gothenburg, Sweden;1. School of Mathematics and Statistics, University of Melbourne, Melbourne, Australia;2. Department of Management, Payame Noor University, Tehran, Iran
Abstract:This study considers a flowshop type production system consisting of m machines. A material handling robot transports the parts between the machines and loads and unloads the machines. We consider the sequencing of the robot moves and determining the speeds of these moves simultaneously. These decisions affect both the robot’s energy consumption and the production speed of the system. In this study, these two objectives are considered simultaneously. We propose a second order cone programming formulation to find Pareto efficient solutions. We also develop a heuristic algorithm that finds a set of approximate Pareto efficient solutions. The conic formulation can find robot schedules for small cells with less number of machines in reasonable computation times. Our heuristic algorithm can generate a large set of approximate Pareto efficient solutions in a very short computational time. Proposed solution approaches help the decision-maker to achieve the best trade-off between the throughput of a cell and the energy efficiency of a material handling robot.
Keywords:Bicriteria scheduling  Robotic cell  Energy consumption  Robot speed control  Second order cone programming
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号