300 MW 火力发电机组定子吊装方法
引用本文:朱继伟. 300 MW 火力发电机组定子吊装方法[J]. 山西建筑, 2014, 0(8): 109-111
作者姓名:朱继伟
作者单位:中国能建山西电建二公司,山西朔州038500
摘    要:通过对制作箱形吊装梁和行车轨道梁的分析和计算,详细介绍了晋城国投热电一期2×300 MW机组工程发电机定子的吊装方法,实践证明:采用汽机房两台80 t行车抬吊进行发电机定子吊装,既保证了工期,也节约了施工成本。

关 键 词:发电机定子  抬吊  行车轨道梁

On hoisting method for stator of 300 MW thermal power set
ZHU Ji-wei. On hoisting method for stator of 300 MW thermal power set[J]. Shanxi Architecture, 2014, 0(8): 109-111
Authors:ZHU Ji-wei
Affiliation:ZHU Ji-wei (No. 2 Company, Shanxi Power Construction of China Energy Engineering Group Co. , Ltd , Shuozhou 038500, China)
Abstract:Accoraing to the analysis and calculation of the manufacturing box-type hoisting beam and the rail beam of the bridge crane rail, the paper mainly introduces the hoisting method for the generator stator of 2 x 300 MW set in the first phase of Jincheng National Development and In- vestment Thermoelectricity, and proves by the practice the two 80-ton bridge cranes hoisting in the steam engine room can be adopted in the hos- ting of the generator stator, so as to ensure the construction period and save the construction cost.
Keywords:generator stator   hoisting   bridge crane rail beam