地下连续墙在风化岩地层中的成槽工艺
引用本文:宋连河. 地下连续墙在风化岩地层中的成槽工艺[J]. 山西建筑, 2014, 0(8): 69-70
作者姓名:宋连河
作者单位:石家庄市轨道交通有限责任公司,河北石家庄050000
摘    要:以具体工程为例,阐述了在中风化为主的地层中地下连续墙成槽施工方法的选择原则,对具体的施工工艺进行了介绍,并针对施工中遇到的孔斜、掉锤、卡钻等问题提出了解决措施,以确保地连墙成槽质量。

关 键 词:地下连续墙  成槽  施工  泥浆

The grooving process of underground continuous wall in weathered rock strata
SONG Lian-he. The grooving process of underground continuous wall in weathered rock strata[J]. Shanxi Architecture, 2014, 0(8): 69-70
Authors:SONG Lian-he
Affiliation:SONG Lian-he ( Shijiazhuang Rail Transportation Limited Liability Company, Shijiazhuang 050000, China)
Abstract:Taking specific project as an example, this paper elaborated the selection principles of underground continuous wail trench construction method in strata mainly weathering, introduced specific construction technology, and put forward solve measures according to encountered the hole deviation, drop hammer, sticking and other problems, so as to ensure the grooving quality of underground continuous wall.
Keywords:underground continuous wall   grooving   construction   mud