首页 | 本学科首页   官方微博 | 高级检索  
     

某高层建筑CFG桩与混凝土灌注桩对比分析
引用本文:付金锐,代常友,刘丹丹.某高层建筑CFG桩与混凝土灌注桩对比分析[J].山西建筑,2014(8):58-59.
作者姓名:付金锐  代常友  刘丹丹
作者单位:黄河勘测规划设计有限公司,河南洛阳471002
摘    要:通过某场地高层建筑CFG桩复合地基方案与该地区通常采用的混凝土灌注桩方案对比分析,结果表明:CFG桩复合地基方案能充分发挥桩间老黄土无湿陷性、承载能力高的特点,可大幅度节省投资,技术上可行,并且填补了CFG复合地基在洛阳地区工程建设领域的空白。

关 键 词:老黄土  高层建筑  CFG桩  混凝土灌注桩

Comparative analysis on CFG pile and bored concrete pile of the high-rise building
FU Jin-rui,DAI Chang-you,LIU Dan-dan.Comparative analysis on CFG pile and bored concrete pile of the high-rise building[J].Shanxi Architecture,2014(8):58-59.
Authors:FU Jin-rui  DAI Chang-you  LIU Dan-dan
Affiliation:( Yellow River Survey & Planning & Design Co. , Ltd, Luoyang 471002, China)
Abstract:The paper comparatively analyzes CFG pile composite foundations scheme of the high-rise building and the bored concrete pile. The re- sults show that: CFG pile composite foundation scheme can play the characteristics of old loess including non-collapsibility and high bearing ca- pacity, which can save investment, possess feasible technology, and makes up CFG composite foundation in engineering construction field in Luoyang.
Keywords:old loess  high-rise building  CFG pile  bored concrete pile
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号