首页 | 本学科首页   官方微博 | 高级检索  
     

长大隧道机械化配套快速施工技术
引用本文:刘营. 长大隧道机械化配套快速施工技术[J]. 山西建筑, 2014, 0(8): 190-191
作者姓名:刘营
作者单位:中铁隧道集团有限公司,河南洛阳471009
摘    要:以三都隧道出口施工机械化配套为例,介绍了机械化配套施工方案,对隧道开挖、喷射混凝土、仰拱等施工机械配套技术进行了阐述,以加快施工进度,确保施工安全及质量。

关 键 词:隧道  机械化配套  快速施工  技术

On speedy construction technique for mechanization matching for long tunnels
LIU Ying. On speedy construction technique for mechanization matching for long tunnels[J]. Shanxi Architecture, 2014, 0(8): 190-191
Authors:LIU Ying
Affiliation:LIU Ying ( China Railway Tunnel Group Co. , Ltd, Luoyang 471009, China)
Abstract:Taking the mechanization matching of Sandu Tunnel entrance construction as the example, the paper introduces the construction scheme for the mechanization matching, and illustrates the techniques for the mechanization matching, including the tunnel excavation, the sprayed concrete, and the inverted arch, so as to accelerate the construction progress, and ensure the construction safety and quality.
Keywords:tunnel   mechanization matching   speedy construction   technique
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号