首页 | 本学科首页   官方微博 | 高级检索  
     

高坝洲水利枢纽的泄洪消能设计
引用本文:陈进. 高坝洲水利枢纽的泄洪消能设计[J]. 人民长江, 1997, 28(9): 20-21,24
作者姓名:陈进
作者单位:长江水利委员会设计院枢纽处
摘    要:高坝洲枢纽泄洪消能建筑物的设计方案,是在诸多方案比较和水工模型试验的基础上,经不断优化选定的。泄洪布置较好地顺应了原来的河势,满足了二期导流的要求。选定的消能工较好地解决了大单宽流量,低佛氏数和水位变幅大,运用工况复杂的消能问题。

关 键 词:泄水建筑物 消能工 结构设计 水利枢纽 泄洪

Design of flood releasing and energy dissipation for GP
Chen Jin. Design of flood releasing and energy dissipation for GP[J]. Yangtze River, 1997, 28(9): 20-21,24
Authors:Chen Jin
Abstract:The design scheme of flood releasing structures and energy dissipators is selected and optimized on the basis of comparing many schemes and hydraulic model tests. The layout of the flood releasing structures conforms to the original river regime well and meets requirements for the second-stage river diversion. The selected energy dissipators are fairly suitable for solving the problems on energy dissipation with large unit discharge, small Froude number, large stage fluctuation range and complicated operation condition.
Keywords:Outlet structure Dissipator Structural stability Optimum alternative Gaobazhou Project
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号