首页 | 本学科首页   官方微博 | 高级检索  
     

基于几何非线性的自锚式斜拉-悬索协作体系桥成桥索力计算
引用本文:张哲,朱巍志,潘盛山,余报楚.基于几何非线性的自锚式斜拉-悬索协作体系桥成桥索力计算[J].沈阳建筑工程学院学报(自然科学版),2009,25(5):822-828.
作者姓名:张哲  朱巍志  潘盛山  余报楚
作者单位:张哲,朱巍志,潘盛山(大连理工大学桥梁工程研究所,辽宁大连,116024);余报楚(大连水产学院土木水利学院,辽宁大连,116024) 
基金项目:中国博士后基金项目,西部交通建设科技基金项目 
摘    要:目的研究确定自锚式斜拉-悬索协作体系桥成桥状态时构件的空间位置和缆索的成桥索力.方法根据无应力索长和索力的概念推导了无应力索长的索力不变原理,提出了自锚式斜拉-悬索协作体系桥成桥索力的计算方法.结果运用该方法对大连跨海大桥的设计方案进行了计算分析,利用该方法计算得到的成桥状态下斜拉索和吊索的索力均匀,主缆线形平顺.除主塔附近的加劲梁由于索距较大造成弯矩较其他区域偏大外,其他区域弯矩分布均匀合理,加劲梁的最大弯矩为14716kN·m.主塔弯矩较小且塔顶水平变位接近于零.结论计算结果表明利用该方法能够按照要求得到该类桥梁的合理成桥索力,并且通过非线性迭代计算得到的缆索无应力长度可以直接应用于施工阶段分析.

关 键 词:自锚式斜拉-悬索协作体系  几何非线性  成桥索力  无应力索长

Research on Reasonable Initial Cable Force of Self-Anchored Cable-Stayed Suspension Bridge Based on Geometrical Nonlinearity Analysis
Affiliation:ZHANG Zhe, ZHU Weizhi, PAN Shengshan , YU Baochu ( 1. Institute of Bridge Engineering, Dalian University of Technology, Dalian China, 116024 ; 2. Department of Civil Engineering, Dalian Fisheries University, Dalian, China 116024 )
Abstract:How to determine the spatial position of structural components and their internal force is the key issue in structural analysis for self-anchored cable-stayed suspension bridge. Based on the concept of the initial force and unstrained length of cable, unstrained length of cable principle of how to keep the internal force of the cable remains unchanged is deduced. According to this principle, the calculating method for the reasonable initial cable force of the self-anchored cable-stayed suspension bridge is proposed on the basis of some available methods. Dalian Gulf Bridge is taken for calculation with this method as an example. Accord- ing to the calculation results under this method, the cable forces of stayed cables and hangers are more uniform and the alignment of the main cable is smooth in the finished bridge state. Also the moment of stiffe- ning gird is more uniform and reasonable. The maximum moment of stiffening gird is 14 716 kN. m. The moment of tower is relatively small and the horizontal displacement of tower top is close to zero. The results show that the method presented in this paper can be used in determining and analyzing the reasonable initial cable force of the self-anchored cable-stayed bridge as required. The results of unstrained length of cable can be directly used in analyzing construction phases of self-anchored cable-stayed bridge.
Keywords:self-anchored cable-stayed suspension bridge  geometrical nonlinearity  initial cable force  unstrained length of cable
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号