路基级配碎石施工工序控制
引用本文:张志洋. 路基级配碎石施工工序控制[J]. 山西建筑, 2007, 33(15): 157-158
作者姓名:张志洋
作者单位:中铁十二局集团第三工程公司,山西太原,030024
摘    要:结合武康增二线引入武汉枢纽工程级配碎石施工,介绍了级配碎石施工原材料、配合比、拌和、摊铺、碾压、养护等关键性的施工工艺,提出了质量保证措施,以确保列车运行的平顺性、稳定性。

关 键 词:级配碎石  配合比  施工工序  质量控制
文章编号:1009-6825(2007)15-0157-02
修稿时间:2007-01-16

Control of constructing procedure of road base debris
ZHANG Zhi-yang. Control of constructing procedure of road base debris[J]. Shanxi Architecture, 2007, 33(15): 157-158
Authors:ZHANG Zhi-yang
Affiliation:ZHANG Zhi-yang
Abstract:Combined with the construction of Wukangzeng secondary line led to join Wuhan pivot,it introduces the key constructing crafts including raw material,mixing rate,blender,stalling,grinding,maintaining of debris construction.It also brings forward measures to maintain the quality so as to ensure the flatness and stability of train's traveling.
Keywords:grade debris  mixing rate  constructing sequence  quality control