首页 | 本学科首页   官方微博 | 高级检索  
     

面向合同生产的钢铁企业多阶段生产物流平衡模型
引用本文:李苏剑, 常志明. 面向合同生产的钢铁企业多阶段生产物流平衡模型[J]. 工程科学学报, 1999, 21(6): 535-538. DOI: 10.13374/j.issn1001-053x.1999.06.007
作者姓名:李苏剑  常志明
摘    要:研究了典型钢铁产品生产工艺流程下的生产物流平衡问题,建立了面向合同交货期和交货量的多阶段生产物流平衡模型.采用启发式算法及粗平衡和细平衡通过调整用户合同的交货期予以解决.

关 键 词:生产物流  模型  钢铁企业
收稿时间:1999-09-20

Facing Contracts Models for Multiple Stages Production Logistics Balance in Iron and Steel Complex
Li Sujian, Chang Zhiming. Facing Contracts Models for Multiple Stages Production Logistics Balance in Iron and Steel Complex[J]. Chinese Journal of Engineering, 1999, 21(6): 535-538. DOI: 10.13374/j.issn1001-053x.1999.06.007
Authors:Li Sujian  Chang Zhiming
Abstract:The problems of production logistics balance are researched according to typical iron and Steel production technological process. Models and methods for multiple stages production logistics balance are built, Which are facing the contracts delivery dates and weights. The models can help production management workers to draw up a balanced production plan.
Keywords:production logistics  model  iron and steel
点击此处可从《工程科学学报》浏览原始摘要信息
点击此处可从《工程科学学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号