首页 | 本学科首页   官方微博 | 高级检索  
     

程潮铁矿2#主溜井加固工程稳定性数值分析
引用本文:宋卫东, 郭寥武. 程潮铁矿2#主溜井加固工程稳定性数值分析[J]. 工程科学学报, 2001, 23(3): 193-195,207. DOI: 10.13374/j.issn1001-053x.2001.03.027
作者姓名:宋卫东  郭寥武
摘    要:针对程潮铁矿2#主溜井

关 键 词:主溜井  托斗法  稳定性分析  数值模拟
收稿时间:2000-12-22

Stability in Reinforcement on No.2 Main Ore-Pass of Chengchao Iron Mine by Numerical Simulation
SONG Weidong, GUO Liaowu. Stability in Reinforcement on No.2 Main Ore-Pass of Chengchao Iron Mine by Numerical Simulation[J]. Chinese Journal of Engineering, 2001, 23(3): 193-195,207. DOI: 10.13374/j.issn1001-053x.2001.03.027
Authors:SONG Weidong  GUO Liaowu
Abstract:According to the reinforcement plan on No.2 main ore-pass of Cheqchao iron mine by the method of support funnel, it is analyzed by numerical simulation that is the stability in the mechanical state of surrounding rock and the local and whole structure before and behind reinforcement, The calculation result presents the theoretical basis for the choice and confirmation of the whole reinforcement plan.
Keywords:main ore-pass  the method of support funnel  stability analysis  numerical simulation
点击此处可从《工程科学学报》浏览原始摘要信息
点击此处可从《工程科学学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号