首页 | 本学科首页   官方微博 | 高级检索  
     


An agent-based algorithm for personnel shift-scheduling and rescheduling in flexible assembly lines
Authors:M Sabar  B Montreuil  J-M Frayret
Affiliation:1. CIRRELT Research Center, Quebec, QC, Canada
2. Institut Sup??rieur de Commerce et d??Administration des Entreprises, Casablanca, Marocco
3. Canada Research Chair in Enterprise Engineering, Quebec, QC, Canada
4. NSERC/Bell/Cisco Business Design Research Chair, Quebec, QC, Canada
5. Universit?? Laval, 2642, Pavillon Palasis-Prince, Quebec, QC, G1K 7P4, Canada
6. ??cole Polytechnique de Montr??al, Quebec, QC, Canada
Abstract:This article is about a multi-agent based algorithm for personnel scheduling and rescheduling in a dynamic environment of a paced multi-product assembly center. The purpose is first to elaborate daily employees?? assignment to workstations so as to minimize the operational costs as well as personnel dissatisfactions; the second is to generate an alternative planning when the first solution has to be rescheduled due to disturbances related to absenteeism. The proposed approach takes into account individual competencies, mobility and preferences of each employee, along with the competency requirements associated with each assembly activity, with respect to both the current master assembly schedule and the line balancing for each product. We use solutions obtained through a simulated annealing algorithm in order to benchmark the performance of the multi-agent approach. Experimental results show that our multi-agent approach can produce high-quality and efficient solutions in a short computational time.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号