首页 | 本学科首页   官方微博 | 高级检索  
     

湿式连接装配式混凝土框架抗连续倒塌静力试验研究
引用本文:袁鑫杰,李易,陆新征,任沛琪,安毅.湿式连接装配式混凝土框架抗连续倒塌静力试验研究[J].土木工程学报,2019,52(12):46-56.
作者姓名:袁鑫杰  李易  陆新征  任沛琪  安毅
作者单位:1. 北京工业大学工程抗震与结构诊治北京市重点实验室,北京 100124; 2. 清华大学土木工程安全与耐久教育部重点实验室,北京 100084;3. 中国建筑标准设计研究院有限公司,北京 100048
摘    要:梁柱节点连接在大变形下的承载和变形能力对装配式混凝土框架结构抗连续倒塌性能具有显著影响。对4个不同湿式节点连接的装配式混凝土框架试件和1个现浇试件进行了静力连续倒塌试验,其中梁采用了机械套筒、弯起锚固和预应力连接,柱采用套筒灌浆和浆锚搭接连接。研究发现:采用机械套筒时梁钢筋在套筒处集中断裂,试件在压拱机制和悬链线机制下的倒塌抗力均显著降低;梁钢筋采用弯起锚固时,试件受力行为和倒塌抗力与现浇试件基本一致;预应力能够显著提升试件在两个机制下的倒塌抗力,但是在极限倒塌变形下预应力锚具传递较大的集中力,导致节点区混凝土的局部劈裂破坏;柱钢筋的套筒灌浆和浆锚搭接连接能够承受连续倒塌大变形下的水平剪力作用,但是柱接缝灌浆层在显著的水平剪力作用下发生滑移,减弱了柱对梁的约束;机制转换时,压拱机制轴压力对试件倒塌抗力产生负贡献;机械套筒和预应力连接试件的梁轴力对倒塌抗力贡献比例分别高于和低于现浇混凝土试件。

关 键 词:装配混凝土框架  湿式连接  连续倒塌  破坏机理  倒塌抗力  变形能力  

Static progressive collapse test on prefabricated concrete #br# frames with wet connections
Yuan Xinjie Li Yi Lu Xinzheng Ren Peiqi An Yi.Static progressive collapse test on prefabricated concrete #br# frames with wet connections[J].China Civil Engineering Journal,2019,52(12):46-56.
Authors:Yuan Xinjie Li Yi Lu Xinzheng Ren Peiqi An Yi
Affiliation:1. Beijing Key Laboratory of Earthquake Engineering and Structural Retrofit,Beijing University of Technology,Beijing 100124,China; 2. Key Laboratory of Civil Engineering Safety and Durability of the Ministry of Education,Tsinghua University,Beijing 100084,China; 3. China Institute of Building Standard Design & Research Co. ,Ltd. ,Beijing 100048,China
Abstract:The loading and deformation capacities of beam-column joints under large deformation have a significant impact on the progressive collapse performance of prefabricated concrete frame structures. A static progressive collapse test was conducted on four prefabricated concrete frame specimens with different wet connections and one cast in situ specimen. Mechanical sleeves,bent-up steel bar anchorage and prestressing tendon were used as the connections of beam reinforcement,while rebar splicing by grout-filled coupling sleeve and rebar lapping in grout-filled hole were used as the connections of column reinforcement. It is found that all bottom reinforcing bars in the beam fractured simultaneously at the same location of one sleeve when the mechanical sleeves were used,which significantly reduced the collapse resistance of the specimen under the compression arch mechanism and the catenary mechanismWhen the beam reinforcement was bent up and anchored in concrete,the mechanical behavior and collapse resistance of the specimen were very similar with those of the cast-in-situ specimen. The prestressing tendon significantly improved the collapse resistance of the specimen under the two mechanisms,but local splitting failure of concrete in the joint was induced by the concentrated load transferred from the prestressed anchors under the ultimate deformationThe rebar splicing by grout filled coupling sleeve and the rebar lapping in grout-filled hole of the column steel bars were capable to withstand the horizontal shear force under large deformation in progressive collapse,but shear-slip of the column jointgrouting layer was found when exposed to the significant horizontal shear force,which in turn weakened the constraint of the column to the beam. When the collapse-resisting mechanism was transformed from the compression arch mechanism to the catenary mechanism,the axial compressive force of the compressive arch mechanism negatively contributed to the collapse resistance of the specimen. The contribution of axial force to collapse resistance of the specimens connected by mechanical sleeves and prestressing tendon were respectively higher and lower than that of the cast-in-situ concrete specimen.
Keywords:prefabricated concrete frame  wet connection  progressive collapse  failure mechanism  collapse resistance  deformation capacity  
本文献已被 CNKI 等数据库收录!
点击此处可从《土木工程学报》浏览原始摘要信息
点击此处可从《土木工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号