A biobjective model for production planning in a cement factory |
| |
Authors: | Pakorn Adulbhan Mario T. Tabucanon |
| |
Affiliation: | Industrial Engineering and Management Division, Asian Institute of Technology, Bangkok, Thailand |
| |
Abstract: | This paper is an illustration of the application of biobjective linear programming to determining the optimal allocation of production materials to the major production facilities. The system under consideration is a cement factory. However, the approach and methodology are sufficiently general that the method can be applied to similar problems in other firms.Two objectives of the factory are distinguished: minimization of manufacturing cost and maximization of capacity utilization. Addressed to the needs of the biobjective case, a technique, which is referred to as ‘compromise constraint’ technique, is introduced. |
| |
Keywords: | |
本文献已被 ScienceDirect 等数据库收录! |
|