首页 | 本学科首页   官方微博 | 高级检索  
     


A biobjective model for production planning in a cement factory
Authors:Pakorn Adulbhan  Mario T. Tabucanon
Affiliation:Industrial Engineering and Management Division, Asian Institute of Technology, Bangkok, Thailand
Abstract:This paper is an illustration of the application of biobjective linear programming to determining the optimal allocation of production materials to the major production facilities. The system under consideration is a cement factory. However, the approach and methodology are sufficiently general that the method can be applied to similar problems in other firms.Two objectives of the factory are distinguished: minimization of manufacturing cost and maximization of capacity utilization. Addressed to the needs of the biobjective case, a technique, which is referred to as ‘compromise constraint’ technique, is introduced.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号