超长梁板大跨度部分预应力楼(屋)盖设计
引用本文:林光华,刘嘉玉. 超长梁板大跨度部分预应力楼(屋)盖设计[J]. 结构工程师, 2003, 0(1): 1-4,42
作者姓名:林光华  刘嘉玉
作者单位:1. 上海纺织建筑设计研究院,上海,200010
2. 上海中房建筑设计院,上海,200010
摘    要:介绍超长梁板大跨度部分预应力楼(屋)盖设计,提出通过设置后浇带,无粘结预应力筋在大跨度梁板中取消设置伸缩缝的设计方法,并分析了受力和测试情况,证明超长预应力梁在工程中采用是可行的,但对预应力损失计算应作相应调整。

关 键 词:超长梁板 预应力混凝土 连续梁 伸缩缝 后浇带

Design of Partially Prestressed Beam-Slab Floor System with Super Large Span
LIN Guanghua. Design of Partially Prestressed Beam-Slab Floor System with Super Large Span[J]. Structural Engineers, 2003, 0(1): 1-4,42
Authors:LIN Guanghua
Abstract:In this paper, a design method of partially prestressed beam-slab floor system with super large span is introduced. There is no contraction joint in the beam-slab floor system with super large span by employing the post cast strip and unbonded prestressing tendons in the design. The new structural system is suitable, which was verified by the testing resulats on site. But the calculation method of prestressing loss needs to be adjusted for this kind of prestressed concrete structure with super large sapn.
Keywords:super large span   partially prestressed concrete continued bean   contraction joint   post cast strip   prestressing loss