首页 | 本学科首页   官方微博 | 高级检索  
     

基于相关分析和回归模型的引江济太水量水质关系分析
引用本文:朱跃龙,朱佳丽,李士进,吴浩云,陆铭锋,陈方. 基于相关分析和回归模型的引江济太水量水质关系分析[J]. 微电子学与计算机, 2012, 29(3): 47-50
作者姓名:朱跃龙  朱佳丽  李士进  吴浩云  陆铭锋  陈方
作者单位:1. 河海大学计算机与信息学院,江苏南京,210098
2. 水利部太湖流域管理局,上海,200434
基金项目:国家自然科学基金项目,水利部948项目
摘    要:在分析引江过程中水质水量关系时,先采用相关分析理论判断水质与水量是否具有相关性,以及两者的相关程度,再根据相关分析结果,建立初始水质情况与达标时所需引水量之间的关系模型,并对模型进行检验.由于望亭立交闸下的水质会受到望虞河干流各站点水质的影响,因此在考察水质水量的关系时,初始水质情况由各站点的初始水质共同决定,达标时所需的引水量由各站点水质均达标时流经望亭立交闸下的累计引水量决定.在对水质水量建立回归模型时,考虑到季节变化的因素以及异常值的影响,根据相关分析结果分别建立不同情况下的回归模型,并通过对不同模型进行比较来确定最终模型,从而保证水质水量关系模型的正确性.

关 键 词:引江济太  水质水量分析  相关分析  回归模型  望虞河流域

Analysis of Water Quality and Quantity in Yangtze River-Taihu Lake Water Transfer Project Based on Correlation Analysis and Regression Models
ZHU Yue-long,ZHU Jia-li,LI Shi-jin,WU Hao-yun,LU Ming-feng,CHEN Fang. Analysis of Water Quality and Quantity in Yangtze River-Taihu Lake Water Transfer Project Based on Correlation Analysis and Regression Models[J]. Microelectronics & Computer, 2012, 29(3): 47-50
Authors:ZHU Yue-long  ZHU Jia-li  LI Shi-jin  WU Hao-yun  LU Ming-feng  CHEN Fang
Affiliation:1 School of Computer & Information Engineering,Hohai University,Nanjing 210098,China; 2 Taihu Basin Administration of the Ministry of Water Resources,Shanghai 200434,China)
Abstract:In analysis of how the water quality changes with the change of water quantity,firstly we adopt correlation analysis to determine the relevance between water quality and water quantity,and then build the relational model of the initial water quality and the ultimately required amount of water,finally we test the model.In the process of engineering experiment,the highlight is that how munch water is required in Changshu water control to make the water under the Wangting interchange gates reach the standard.For the water quality under Wangting interchange gates is influenced by the water along the Wangyu River,we suppose that the initial water quality is measured by the initial water in all sites,and that when the water in each site along the Wangyu River reaches the standard,the total amount of water flow through the Wangting interchange gates is the required amount,so that we can guarantee the data used to modeling is reliable.In the process of modeling,considering the influence of seasonal changes and outliers,we respectively build different models based on correlation analysis,and then by comparison,we determine the final model,which has guaranteed the accuracy of our approach.
Keywords:Yangtze River-Taihu Lake Water Transfer Project  analysis of water quality and quantity  correlation analysis  regression model  Wangyu River
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号