首页 | 本学科首页   官方微博 | 高级检索  
     

钢管混凝土拱桥拱肋抗震能力评估方法
引用本文:谢开仲,吕文高,覃乐勤.钢管混凝土拱桥拱肋抗震能力评估方法[J].桂林工学院学报,2010,30(4):540-544.
作者姓名:谢开仲  吕文高  覃乐勤
作者单位:[1]同济大学桥梁工程系,上海200092 [2]广西大学土木建筑工程学院,南宁530004
基金项目:国家自然科学基金,广西科学研究与技术开发计划项目
摘    要:钢管混凝土(CFST)拱桥的抗震能力取决于拱肋抗震能力,为了准确地评估CFST拱桥拱肋的抗震能力,提出基于CFST截面屈服状态的评估方法,把拱肋截面屈服状态分为5个阶段,并结合N-M曲线得出抗震能力评估区域。采用地震反应时程分析方法计算地震效应,对CFST拱桥拱肋的抗震能力进行评估,以南宁永和大桥为工程背景进行拱肋的抗震能力评估。得出以下结论:拱顶和拱脚为最危险的截面;7度地震作用下拱肋的大部分仍处于Ⅰ阶段;8度地震作用下拱肋的大部分截面已处于Ⅱ阶段,只有少数截面仍处于Ⅰ阶段;9度地震作用下拱肋的大部分截面已处于Ⅱ阶段,少数截面已处于Ⅲ阶段。基于截面屈服状态的方法是抗震能力评估的一个有效方法。

关 键 词:钢管混凝土拱桥  拱肋  抗震能力  时程分析  评估方法

Seismic Capacity Evaluation for Ribs of CFST Arch Bridge
XIE Kai-zhong,LU Wen-gao,QIN Le-qin.Seismic Capacity Evaluation for Ribs of CFST Arch Bridge[J].Journal of Guilin University of Technology,2010,30(4):540-544.
Authors:XIE Kai-zhong  LU Wen-gao  QIN Le-qin
Affiliation:1.Department of Bridge Engineering,Tongji University,Shanghai 200092,China;2.School of Civil Engineering and Architecture,Guangxi University,Nanning 530004,China)
Abstract:The seismic capacity of CFST arch bridge depends on the seismic capacity of arch ribs.In order to evaluate accurately the seismic capacity of the arch ribs,evaluation method is presented based on the yield state of the ribs cross-section.In this method,the yield state of the sections is divided into five stages and combines with N-M curves to obtain the districts in which the seismic capacity can be evaluated.The seismic effects is calculated in time-history response analysis.The seismic capacity of the ribs of Nanning Yonghe Bridge is evaluated.It is found:the top and the foot of the arch are dangerous sections,esp.the part of ribs ofⅠ state under 7 degree earthquake.Only a few sections are still inⅠ state,other sections of the arch rib are in Ⅱ yield state under 8 degree earthquake.Most sections of the arch ribs are inⅡ state and some sections are in Ⅲ state under 9 degree earthquake.This method is effective for the evaluation of seismic capacity.
Keywords:concrete-filled steel tube(CFST)  arch bridge  arch rib  seismic capacity  time-history analysis  evaluation method
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号