丹江口大坝加高工程下游河床冲刷坑成因分析
引用本文:王启国,黄海蛟,宋斌,王小波.丹江口大坝加高工程下游河床冲刷坑成因分析[J].水利科技与经济,2007,13(9):639-641.
作者姓名:王启国  黄海蛟  宋斌  王小波
作者单位:长江水利委员会,长江岩土工程总公司,武汉,430010;长江水利委员会,长江勘测技术研究所,武汉,430010
摘    要:丹江口大坝为满足南水北调中线一期工程引水的需要,需加高13 m。初期工程泄洪调度贯彻了先开深孔,后开表孔的原则,根据记录,深孔泄洪9~11坝段的3~8孔泄洪历时最长,下游河床受到了一定程度的冲刷,并形成了多处冲刷坑。目前,下游河床冲刷在深度上已稳定,但往上游、东侧两方向仍有发展。大坝加高后,挑距加大,可能在下游侧产生严重冲刷,并且冲刷坑最低点向下游侧移动;深孔坝段可能使目前的冲刷坑加深,并向下游河床扩展。为了保证大坝安全运行,需要采取相关的工程处理措施。

关 键 词:南水北调  大坝加高  泄洪  冲刷坑  演化趋势  工程处理
文章编号:1006-7175(2007)09-0639-03
修稿时间:2007-03-08

Downriver Scouring Pit Origin Analyzed in the Project of Raising the Danjiangkou Dam
WANG Qi-guo,HANG Hai-jiao,SONG Bin,WANG Xiao-bo.Downriver Scouring Pit Origin Analyzed in the Project of Raising the Danjiangkou Dam[J].Water Conservancy Science and Technology and Economy,2007,13(9):639-641.
Authors:WANG Qi-guo  HANG Hai-jiao  SONG Bin  WANG Xiao-bo
Affiliation:1. Hydro - conservancy committee of Yangtze River, Yangtze River crag earth project corporation, Wu Han 430010, China; 2. Hydro- conservancy committee of Yangtze River, Yangtze River survey technical research institute, Wu Han 430010, China
Abstract:In order to meets the needs of the South-to-North Water Diversion Project,the Danjiangkou dam need to be raised 13 meters.In the initial period of the project,flood discharges dispatch the principle that open the deep hole first then followed by the table hole.According to the record, flood charge in the deep hole 9-11 dam of hole 3-8 experience the longest time, the downriver bed received the certain degree of flushing,and formed many pits.Now the downriver scouring already stabilized in depth,but the scour will move to the upstream and the East direction.In order to make the dam operates safety;we need to adopt the appropriate measure.
Keywords:South-to-North Water Diversion Project  raising the dam  flood discharge  washes out the pit  evolved tendency  project processing