禹门口提水东扩工程泵站冬季施工保温措施
引用本文:兰欢欢.禹门口提水东扩工程泵站冬季施工保温措施[J].山西水利科技,2012(3):26-27.
作者姓名:兰欢欢
作者单位:山西省水利建筑工程局,山西太原,030006
摘    要:禹门口提水东扩工程泵站冬季气温低于5℃,针对一级泵站工期紧、任务重等情况,在混凝土施工过程中采用了掺加防冻剂、暖棚法、室内加温等一系列保温措施。取得了良好的施工效果。

关 键 词:混凝土  冬季施工  保温措施

On Thermal Insulation Measures During Construction Period of Yumenkou Eastern Extension
LAN Huan-huan.On Thermal Insulation Measures During Construction Period of Yumenkou Eastern Extension[J].Shanxi Hydrotechnics,2012(3):26-27.
Authors:LAN Huan-huan
Affiliation:LAN Huan-huan
Abstract:The air temperature of constructing Yumenkou Eastern Extension Pumping Station in winter is less than 5℃.In view of the situation that the period to construct the first stage pumping station is pressing and the construction task is heavy,a series of thermal insulation measures during winter season to construct this project’s concrete works are adopted.They are adding anti-freezing mixture,heating shed method and raising indoor temperature,and good effect is obtained.
Keywords:concrete  witer construction  thermal insulation measure