首页 | 本学科首页   官方微博 | 高级检索  
     

宽带暂堵转向多缝压裂技术在苏里格气田的应用
引用本文:韩福勇,倪攀,孟海龙.宽带暂堵转向多缝压裂技术在苏里格气田的应用[J].钻井液与完井液,2013,37(2):257-263.
作者姓名:韩福勇  倪攀  孟海龙
作者单位:1. 天津石油职业技术学院, 天津 301603;2. 长庆油田公司第三采气厂, 内蒙古鄂尔多斯 017300
摘    要:为了提高水平井裸眼滑套-封隔器完井、套管固井完井、桥塞分段多簇压裂等施工过程中分级压裂多缝封隔的可靠性,在实验室条件下对暂堵材料进行了分散性测试、降解性分析以及抗压破碎能力评价,并将宽带暂堵转向多缝压裂技术在苏里格气田进行现场应用,取得了较好的转向效果。应用结果表明,采用宽带暂堵转向多缝压裂技术,减少了桥塞、封隔器相关的操作,减少了电缆入井次数,降低了施工风险,提高了施工效率;同时,利用压裂产生的多条裂缝或裂缝网络与气藏富含区域连通,增加了裂缝的长期导流能力,对比同区块水平段长度及钻遇条件相当的水平井,试气无阻流量提高21.1%,投产1年,平均单井累产气量增加3.24×106 m3。暂堵剂与纤维在气田储层温度在90~120℃范围内可实现10d以内完全降解,完全符合安全环保生产要求。

关 键 词:多缝压裂  宽带暂堵转向  降解  评价  产能  
收稿时间:2019-12-15

Application of Diversion through Broadband Temporary Plugging Multi-Fracture Fracturing Technology in Sulige Gas Field
HAN Fuyong,NI Pan,MENG Hailong.Application of Diversion through Broadband Temporary Plugging Multi-Fracture Fracturing Technology in Sulige Gas Field[J].Drilling Fluid & Completion Fluid,2013,37(2):257-263.
Authors:HAN Fuyong  NI Pan  MENG Hailong
Affiliation:1. Tianjin Petroleum Institute of Technology, Tianjin 301603;2. Third Gas Recovery Plant of Changqing Oilfield Company, Ordos, Inner Mongolia 017300
Abstract:To improve the reliability of insulating multi fractures for staged fracturing job in horizontal well completion operation such as open-hole sliding sleeve-packer completion and casing cementing well completion as well as bridge plug segmented multi-cluster fracturing, temporary plugging agents were evaluated in laboratory experiment for their dispersibility, degradability and compression resistance. The diversion through broadband temporary plugging multi-fracture fracturing technology was used in Sulige gas field with good diverting effect. Field application showed that, using diversion through broadband temporary plugging multi-fracture fracturing technology, operation of bridge plug and packer was simplified, number of cable running reduced, operational risk mitigated and operation efficiency improved. Meanwhile, the long-term flow conductivity of fractures can be increased by the connection of multi fractures or fracture network produced by the fracturing operation to gas-rich zones. Compared with offset horizontal wells with similar horizontal lengths and downhole conditions, the open flow rate of gas during well test was increased by 21.1%. After one year of production, the average cumulative gas production of a single well was increased by 3.24×106 m3. The temporary plugging agents and fibers used can be completely degraded in 10 days at reservoir temperature of 90-120℃ in Sulige gas field, fully meeting the requirements of safe and environmentally friendly production.
Keywords:Multi-fracture fracturing  Divert through broadband temporary plugging  Degrade  Evaluate  Production capacity  
点击此处可从《钻井液与完井液》浏览原始摘要信息
点击此处可从《钻井液与完井液》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号