首页 | 本学科首页   官方微博 | 高级检索  
     

港珠澳大桥隧道人工岛暗埋段基坑防渗方案研究
引用本文:李蘅,倪锦初,杜泽金. 港珠澳大桥隧道人工岛暗埋段基坑防渗方案研究[J]. 人民长江, 2011, 42(16): 1-4
作者姓名:李蘅  倪锦初  杜泽金
作者单位:长江勘测规划设计研究有限责任公司施工设计处,湖北武汉,430010
摘    要:拟建的港珠澳大桥,为实现桥隧平顺过渡,设置了东、西两座海中隧道人工岛.人工岛地基土上部为深厚淤泥及粉质黏土夹砂层,下部为承压水中砂层,基坑最大开挖深度达15.5 m.为达到基坑干地安全施工目的,综合考虑人工岛支护结构、地基处理方案等因素,对西人工岛暗埋段基坑防渗降水的保留粉质黏土防渗层方案和设置升浆混凝土封底方案进行了...

关 键 词:隧道人工岛  基坑防渗  方案比选  港珠澳大桥

Study on seepage control scheme of foundation excavation of artificial island for tunnel of Hong Kong-Zhuhai-Macao Bridge
LI Heng,NI Jinchu,DU Zejin. Study on seepage control scheme of foundation excavation of artificial island for tunnel of Hong Kong-Zhuhai-Macao Bridge[J]. Yangtze River, 2011, 42(16): 1-4
Authors:LI Heng  NI Jinchu  DU Zejin
Affiliation:LI Heng,NI Jinchu,DU Zejin(Construction and Design Department,Changjiang Institute of Survey,Planning,Design and Research,Wuhan 430010,China)
Abstract:In order to achieve smooth transition between the proposed Hong Kong-Zhuhai-Macao Bridge and the tunnel,we set up an east and west artificial islands in the sea for tunnel construction.The upper part of the foundation soil of artificial island is thick silt and silt clay with sand layer,the lower is sand with pressure water,and the largest excavation depth of the foundation pit is 15.5m.To achieve the purpose of dry-land and safe construction of foundation excavation,comprehensively considering supporting s...
Keywords:artificial island for tunnel construction  foundation seepage  selection and comparison of schemes  Hong Kong-Zhuhai-Macao Bridge  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《人民长江》浏览原始摘要信息
点击此处可从《人民长江》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号