基于数量化理论I的双护盾TBM掘进速度预测研究
引用本文:延艳彬,许 健,陈 剑,陆丽娟. 基于数量化理论I的双护盾TBM掘进速度预测研究[J]. 水资源与水工程学报, 2015, 26(4): 200-205
作者姓名:延艳彬  许 健  陈 剑  陆丽娟
作者单位:(1.甘肃农业大学 工学院, 甘肃 兰州 730070; 2.甘肃省水利水电勘测设计研究院, 甘肃 兰州 730000)
基金项目:国家批复引洮工程科学研究基金(YT374-ZX33-09107)
摘    要:以甘肃引洮一期工程9#隧洞为例,引入数量化理论I的建模原理和方法,建立了定性数据包括围岩类别和地下水情况2个解释变量,定量数据包括单轴抗压强度、抗拉强度、泊松比和变形模量4个解释变量的预测模型,研究了双护盾TBM施工掘进速度的影响因素,并从理论上证实了该预测模型的可靠性。结果表明:在同等围岩力学参数条件下,围岩稳定性越好越有利于TBM的施工,反之则会阻碍施工进度,且阻碍效应会随着地下水的增多而增强;岩石的泊松比、抗拉强度对TBM掘进速度呈显著正效应,而单轴抗压强度和变形模量呈负效应。通过对实测值和预测值的比较发现,二者掘进速度的相对误差绝对值为0.23%~5.38%,平均值为0.39%,说明预测模型用于双护盾TBM掘进速度的预测是可靠的,并可用于同类工程施工进度的预测和工程进度的控制管理。

关 键 词:水利施工; 长隧洞; 双护盾TBM; 掘进速度; 数量化理论I; 引洮工程

Research on forecast of driving speed of double-shield TBM based on quantitative theory I
YAN Yanbin,XU Jian,CHEN Jian,LU Lijuan. Research on forecast of driving speed of double-shield TBM based on quantitative theory I[J]. Journal of water resources and water engineering, 2015, 26(4): 200-205
Authors:YAN Yanbin  XU Jian  CHEN Jian  LU Lijuan
Abstract:Taking the 9# tunnel of Tao River diversion project phase one in Gansu province for example,the paper introduced the modeling principle and method of quantitative theory.It set up the qualitative data including two explanatory variables of classification of surrounding rock and groundwater conditions, and the quantitative data including four explanatory variables of uniaxial compressive strength, tensile strength, Poisson's ratio and deformation modulus so as to study the influence factors of driving speed of TBM in double shields and verify the reliability of the prediction modelin theory.The results showed that under the same condition of mechanical parameters of surrounding rock,the better the stability of surrounding rock,the more favorable the construction of TBM,otherwise it will hinder the construction schedule and the negative effect of the uniaxial compressive strength enhanced with the increase of groundwater;the tensile strength index and Poisson's ratio of rock has significant positive effect to driving speed of TBM, the uniaxial compressive strength and deformation modulus shows a negative effect.By comparing the measured driving speed with the predicted one,it found that the absolute value of relative error between them is 0.23%~ 5.38%, the average value is 0.39%,which illustrated that the prediction of driving speed for double-shield TBM by the forecast model is reliable.The model can be used to forecast the construction progress and control management of project progress of similar projection.
Keywords: