8128综采工作面过陷落柱安全施工技术
引用本文:吴强.8128综采工作面过陷落柱安全施工技术[J].山东煤炭科技,2020(4):3-5.
作者姓名:吴强
作者单位:大同煤矿集团朔州煤电小峪煤业有限公司,山西朔州 038300
摘    要:为了保证8128工作面安全快速过X3陷落柱,提高煤柱回采量,决定采用分层松动爆破施工工艺,并在过陷落柱期间对工作面顶板采用“注浆加固+超前支护+JW锚索吊棚”联合控制措施。工作面过陷落柱仅用8d,平均回采速度达6.6m/d,未发生顶板破碎、冒落现象,取得了显著应用成效。

关 键 词:综采  陷落柱  施工

Safety Construction Technology of 8128 Fully Mechanized Coal Face Passing Through Collapse Column
Wu Qiang.Safety Construction Technology of 8128 Fully Mechanized Coal Face Passing Through Collapse Column[J].Shandong Coal Science and Technology,2020(4):3-5.
Authors:Wu Qiang
Affiliation:(Shuozhou Coal Power Xiaoyu Coal Industry Co.,Ltd.,Datong Coal Mine Group,Shanxi Shuozhou 038300)
Abstract:In order to ensure the safety and speed of 8128 working face passing through X3 collapse column and improve the recovery of coal pillar,it is decided to adopt layered loose blasting construction technology.During the period of passing through collapse column,the joint control measures of"grouting reinforcement+advance support+JW anchor cable hanging shed"are adopted for the roof of working face.It only takes 8d for the working face to pass the collapse column,The average mining speed is 6.6m/d,and there is no roof breaking and caving phenomenon.The application effect is remarkable.
Keywords:fully mechanized mining  collapse column  construction