2-105工作面进风巷高预应力锚杆支护技术研究与应用
引用本文:席建立.2-105工作面进风巷高预应力锚杆支护技术研究与应用[J].山东煤炭科技,2020(6):43-45.
作者姓名:席建立
作者单位:山西霍宝干河煤矿有限公司,山西 洪洞 041600
摘    要:为保障干河煤矿2-105工作面进风巷复合顶板围岩的稳定,采用现场试验与数值模拟具体分析锚杆(索)预紧力对复合顶板的控制效果,进行高预应力锚杆支护方案设计。掘进期间顶板下沉及两帮移近量的最大值分别为57mm和64mm,保障了巷道围岩的稳定。

关 键 词:综采  复合  巷道  支护

Research and Application of High Pre-stress Bolt Support Technology in the 2-105 Face Inlet Air Roadway
Xi Jian-li.Research and Application of High Pre-stress Bolt Support Technology in the 2-105 Face Inlet Air Roadway[J].Shandong Coal Science and Technology,2020(6):43-45.
Authors:Xi Jian-li
Affiliation:(Shanxi Huobao Ganhe Coal Mine Co.,Ltd.,Shanxi Hongtong 041600)
Abstract:In order to ensure the stability of the surrounding rock of the compound roof of the air intake roadway in the 2-105 working face of Ganhe Coal Mine,the control effect of the bolt(cable)pretension on the compound roof is analyzed by field test and numerical simulation,and the high prestressed bolt support scheme is designed.The maximum values of roof subsidence and two side displacement are 57mm and 64mm respectively,which ensure the stability of surrounding rock.
Keywords:fully mechanized mining  composite  roadway  support