首页 | 本学科首页   官方微博 | 高级检索  
     

脱盐水站扩能改造
引用本文:丁宁,吴小金.脱盐水站扩能改造[J].工业用水与废水,2016(5):43-46.
作者姓名:丁宁  吴小金
作者单位:安徽东华环境市政工程有限责任公司,合肥,230088
摘    要:由于脱盐水站产水量达不到需水量要求,扩能改造工程将工业废水回用水与原脱盐水站一级反渗透产水混合后进入二级反渗透进行脱盐,降低后续混床进水的可溶性固体物质浓度,并新增1台混床与原混床并联,增加混床处理水量。扩能改造后,脱盐水站运行稳定,产水量满足锅炉补给水要求。

关 键 词:脱盐水站  二级反渗透  扩能改造  混床

Capacity expansion revamping of desalted water station
Abstract:In view of the fact that water yield of desalted water station can not reach the requirement of water demand, a capacity expansion revamping project was implemented, which using two stage reverse osmosis to desalt the mixture of industrial wastewater reuse water and effluent water from one stage reverse osmosis unit of the original desalted water station, so as to reduce the soluble solid concentration of subsequent mixed bed in-fluent water. Besides, in order to increase the water treatment capacity, one more mixed bed was newly adopted and combined with the original mixed bed in parallel. Upon the completion, the operation of the desalted water station was stable, and the water yield met the requirement of boiler feedwater.
Keywords:desalted water station  two stage reverse osmosis  capacity expansion revamping  mixed bed
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号