首页 | 本学科首页   官方微博 | 高级检索  
     

大朝山水电站截流设计与施工
引用本文:龙德海.大朝山水电站截流设计与施工[J].水力发电,1998(9):50-54.
作者姓名:龙德海
作者单位:大朝山水电站工程建设八三联营体,云南,云县,675811
摘    要:大朝山水电站是在上游梯级漫湾电站控泄发电条件下截流的。这样可以减小截流难度,提前截流,加长一枯施工工期。预进占施工采取了连续施工,并在大流量到来之前做好堤头保护工作。截流成功后,连续高强度施工在国内少见。控泄发电结束后,漫湾电站可按5台机正常发电。总之,经过精心准备,科学组织施工,保证了大朝山水电站截流工程的圆满成功。

关 键 词:截流设计  截流施工  挖泄发电  导流  水电站
修稿时间:1998-07-20

Design and construction of the river closure for Dachaoshan Hydropower Station
Long Dehai.Design and construction of the river closure for Dachaoshan Hydropower Station[J].Water Power,1998(9):50-54.
Authors:Long Dehai
Affiliation:Eight Three Construction Joint Venture of Dachashan Hydropower Project
Abstract:The river closure for Dachaoshan Hydropower Station was conducted under the conditions of controlling the water releasing for power generation in Manwan Hydropower Station in its upstream, which can reduce the difficulties of river closure to complete the river closure ahead of time and increase the construction time during the dry season. The pre advancement construction adopts the incontinuously construction and the protective work for the dam was prepared before the advent of large discharge. After the successful completion of the river closure, the continuous high strength construction is rare in China. After the end of controlling the water discharging for power generation, five generating units of the Manwan Hydropower Station will be put into operation. In a word, the careful preparation and scientific organization and construction have been guaranteed the satisfactory completion of the river closure for Dachaoshan Hydropower Station.
Keywords:river closure design  river closure construction  power generation  diversion  river closure mouth  Dachaoshan Hydropower Station  Manwan Hydropower Station  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号