首页 | 本学科首页   官方微博 | 高级检索  
     

集中供热系统供热首站方案选择和经济性分析
引用本文:周浩,李小平. 集中供热系统供热首站方案选择和经济性分析[J]. 山西建筑, 2011, 37(11): 123-124
作者姓名:周浩  李小平
作者单位:包头市热力总公司,内蒙古,包头,014030
摘    要:结合集中供热系统热源供热首站方案实例,对直接连接混水+分布式变频泵和间接连接两种方案进行了初投资、运行电耗成本及维护成本等方面的经济技术性分析,得出了在保证系统安全的情况下,采用直接连接混水方案经济性更好的结论。

关 键 词:集中供热系统  供热首站  直接连接混水  间接连接

Scheme selection and economic analysis on the first heating supply station of central heating system
ZHOU Hao,LI Xiao-ping. Scheme selection and economic analysis on the first heating supply station of central heating system[J]. Shanxi Architecture, 2011, 37(11): 123-124
Authors:ZHOU Hao  LI Xiao-ping
Affiliation:ZHOU Hao LI Xiao-ping
Abstract:Based on the first heating supply station scheme case of the central heating system, it carries on economic and technical analysis on the two schemes of directly connecting mixing water + distributive type frequency changing pump and indirectly connecting from aspects of prelim- inary investment, running cost, and maintenance cost and so on, and concludes that the economic property will be better by applying directly connecting mixing waier scheme under the condition of guaranteeing the safe system.
Keywords:central heating system   the first heating supply station   directly connecting mixing water   indirect connection
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号